News Flash Home
The original item was published from 9/18/2025 1:53:32 PM to 9/18/2025 1:53:58 PM.

News Flash

Public Works

Posted on: September 18, 2025

[ARCHIVED] King, Prescott, Washington Street Paving 9/18

STREET PAVING NOTICE

September 18, 2025

 


2025 ROAD RESURFACING AND RELATED WORK CONTRACT

 TOWN CONTRACTOR: P.J. ALBERT INC.

PAVING LIST

 Listed alphabetically

 King Street                  (All)

Prescott Street             (Summer Avenue to Lincoln Street)

Washington Street      (Woburn Street to Lincoln Street)

 

 SIDEWALK WORK LIST 

 Prescott Street             (Summer Avenue to Lincoln Street) 


Please be advised that, within the next few weeks, the Town of Reading, Department of Public Works and its contractor, P.J. Albert, Inc., will begin construction on your road or a portion of the road near your home.  The list of roads and the type of work are on the opposite side of this notice.  It is our goal to have the work completed within four to eight weeks of the start date (weather dependent).  To complete this endeavor, we are asking you for your assistance.  

 

  1. Please do not park on the travel way or on the sides of the roads during construction hours (typical schedule of Monday-Friday from 7:00 A.M. to 5:00 P.M.).  Cars parked on the travel way during construction will slow down the work and may force us to tow the vehicles out of the way.

 

  1. During paving operations, the road may be impassable at times.  Allowing extra time for appointments is recommended.  If you need to travel during the paving day, we ask that you move your car to a side street outside of the construction area so that you will not be blocked in.  It is expected that, for each street, the completion of the paving operation will take less than one day.

 

  1. Please have your trash placed out at the curb, on your day of trash collection, by 6:30 A.M.  During days that the road is closed and it is your trash collection day, the Town may have to pick up your trash earlier than you may be used too.

 

  1. Please obey the directives of the police details, workers and warning signs during all construction operations.

 

  1. Any items or installations within the Town Right-of-Way (including lawn irrigation and sprinklers, fencing, electric dog fencing, walls, plants and planters, mailboxes, posts, paver/brick driveway aprons and walkways, railings, stones, cobbles, gravel, asphalt, concrete, timbers, drains and drain pipes, signage, basketball hoops, etc.) are placed there at the Owner’s risk.   Please clearly mark lawn irrigation and sprinklers, and electric dog fencing locations within the Town Right-of-Way.

 

  1. Most importantly, we ask you for your continued support and patience during this project.

 

If you have any questions or require additional information, please do not hesitate to contact the Engineering Division at 781-942-9082.   If you want to stay informed about this project via automated telephone or text messaging, please visit www.readingma.gov and select “Stay Connected” link to sign up for “Code Red Community Alerts" and opt-in to receive Public Works bulletins.   Additional project information is available at: https://www.readingma.gov/226/Public-Works

 

2025 ROAD RESURFACING AND RELATED WORK CONTRACT

 TOWN CONTRACTOR: P.J. ALBERT INC.

PAVING LIST

 Listed alphabetically

 King Street                  (All)

Prescott Street             (Summer Avenue to Lincoln Street)

Washington Street      (Woburn Street to Lincoln Street)

 

 SIDEWALK WORK LIST 

 Prescott Street             (Summer Avenue to Lincoln Street) 

Facebook Twitter Email

Other News in Public Works

2026 COMPOST STICKERS

Posted on: January 21, 2026